Criss and Madis who joined my workshop here at Scoraig last year have done a workshop at home is Estonia. Here they are installing the 3 metre turbine on an existing wind site:
You can see photos of the course here
Criss and Madis who joined my workshop here at Scoraig last year have done a workshop at home is Estonia. Here they are installing the 3 metre turbine on an existing wind site:
You can see photos of the course here
Buy a Tristar charge controller (UK only)
From: Mike Allen
Subject: Re: A Wind Turbine Recipe Book
Date: 12 April 2013 10:53:18 BST
To: jytte
I recieved the book yesterday and when it arrived I thought ‘this isn’t worth £12’.
But how wrong I was once I’d opened the envelope and settled down to read the contents with a cup of coffee. 3 hours later the coffee was stone cold and I was still reading the book.
Loads of info to be getting on with.
I’ll email Hugh when my terbine is up and running with some pics.
Thanks a lot.
Michael.