New 3.6m ferrite windmill on Scoraig

IMG_20210911_152821267_HDR

bolting on the top piece. Each section is 7.5m long 89mm diameter pipe.

Bookmark the permalink.

2 Responses to IMG_20210911_152821267_HDR

  1. hugh says:

    Yes I lay the pipes end to end concentric at home, and I prepare pieces of flat bar that are bolted together, and lay them on the pipes, and weld one bar to each pipe. Then unbolt them and take the pipes onto the site and reassemble them. This connects them securely. It does not need to work against severe bending stresses or anything since the guys support the tower. They just couple the pipes together neatly. I’ve used this system for many years.
    Hugh

  2. Tom says:

    Are there welded tabs on the two sections that you bolt together?