Upgraded intake for an off grid hydro site

wiring diagram

The electrical system includes an MPPT controller for the hydro input and a diversion load controller to keep the turbines on load when the battery is full.

Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *